Little Ardo Farm is a property in Methlick, Ellon, Ellon (AB41 7HR).
One historical planning record sits against the property in 2011.
This property doesn't have an Energy Performance Certificate yet. An EPC is required to sell or let — and unlocks our automated valuation.
Installation of 2 No. C & F Green Energy 20kW Wind Turbines (Height to Blade Tip 27.131m)Turbine 1:(E:385,395) (N:838,735) Turbine 2:(E:385,455)(N:838,735)
Nearest stop
1.4 km
Monteach Road — bus stop.
AB41 7TY